Total Pageviews

Thursday, November 27, 2014

Engineering Test Question


Conditions: 
An excavator weighing 22 tons is on top of a lowloader trailer and heading east on the Trans-Canada Highway in Alberta. 

The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1-inch steel rebar spaced at 6-inch intervals in a criss-cross pattern layered at a 1-foot vertical spacing.


Solve: 
When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?

Assume no effect for head wind and no braking by the driver, who was on his cell phone.
 
 
Thanks Randy

No comments:

Post a Comment